跳到主要内容

总体规划第2期

Being Good Stewards – Building 的 Future On Our Campus

滚动

总体规划修订

Keeping You Informed as We Improve Concordia

Having maintained continuous operations throughout the pandemic and giving thanks to God for a significant gift from an anonymous donor, Concordia is ready to embark on Phase 2 of its approved Campus 总体规划 at the Turtle Rock Campus. We want to share the exciting campus enhancements designed to improve the students’ experience that we are proposing. But first, some additional exciting news.

新购买的11.4万平方英尺.ft. 康科迪亚-光谱校园™ 现在完成了.

的 grand opening will be held in August 2023, as our successful 护理程序 移动到那个位置. 扩大医疗保健计划, additional administrative office space, and other graduate programs will also be housed there. 的 康科迪亚-光谱校园™ provides an additional 700 parking spaces.

Have questions or comments on the 总体规划?

联系我们

An Improved 总体规划 for Concordia's Future

网站计划

We will be submitting a Major Modification Proposal to the City to address the phasing changes.

Below are the proposed modifications to the final 3 phases of our approved master plan for the Turtle Rock Campus.

While there are changes, we do not believe they are significant.

  • No additional institutional square footage is being added to the previously approved 总体规划 total of 321,220 sq. ft.
  • No additional residential units/beds are being added to the previously approved 总体规划 total of 330 units / 1,320个床位.

的re are requested square footage allocation shifts and bed count shifts among the phases.

  • Phase 2 square footage has a net increase of 8,963 sq. ft.
  • Phase 2 now includes converting Chi Beta back to residential, which shifts 14 units and 56 beds from Phase 3.

Phase 2 enhancements are internal to campus and support existing students. 的 original programming and uses included in the previously approved 总体规划 will remain the same.

 

第二阶段

第三阶段

四个阶段

常见问题

How will the proposed 总体规划 Amendment alter Concordia University's trip count limits as compared to existing limits and those projected for the next phase in the existing 2017 MOU approved by City Council?

就拟议的第2阶段而言, the MOU states that Concordia “shall not exceed 4,每天678次, regardless of the amount of actual existing square footage on the campus.” 的 proposed modification will not exceed the trip cap of 4,每天678次 and is anticipated to generate less trips. 值得注意的是, pursuant to the proposed modification, the total institutional square footage to be built in Phases 1 and 2 will not exceed (and actually will be slightly less) than what was evaluated for Phases 1 and 2 in the EIR. In keeping with the 2017 Memorandum of Understanding and Covenants (MOU), 2018年修订, Concordia will be requesting that the maximum daily trip cap remain fixed at 4,678 “until such time as [Concordia] obtains approvals to proceed with Phase 3.”

It appears Building F10 on the proposed site plan will increase to 17,距核准面积906平方英尺,730平方英尺. Would the new building negatively impact the sight lines to French Hill to the south?

F10大楼的面积正在扩大. We are proposing to add a weight room and workout facility in that building. 的 building height is consistent with what was previously approved with the exception that the height for the press box is 7 feet higher than what was previously approved for that portion only. Consequently, there will be little to no impact on sight lines to French Hill to the south.

What are the estimated commencement and completion dates for the construction work encompassed by the proposed 总体规划 Amendment?

的 estimated commencement of construction is August 2024 and completion is November 2026.

What will be the City review process for the Concordia University application?

This is to be determined by the City once staff has reviewed the application which was submitted July 26, 2023. 的 project will certainly undergo a public hearing process. We will keep the website updated once the process is confirmed by the City and as the public hearing dates are set.

问题及意见

IRVINE SPECTRUM® and SPECTRUM™ are trademarks of Irvine Management Company used with permission.

回到顶部